Paperless logistics directly from SAP—with clear user guidance and maximum process reliability.

Confirmation at the storage lift & workstation control with status C connect:IT

Anyone who operates lifts or other warehouse systems in SAP is familiar with the typical inefficiencies: lists, walking distances, wait times—and inventory levels that don’t “add up” until the end of the shift. In this article, we’ll use real-world scenarios to show how status C connect:IT, as an integration platform for warehouse systems, standardizes confirmation at the lift, enables flexible control of workstations, and noticeably speeds up order picking.

Ready to get right to it? We're here for you!
Mitarbeiter kommissioniert am Lagerlift mit status C connect:IT Bedienoberfläche

How does it work without status C connect:IT? The reality of the process without integrated elevator control.

In many warehouses, the day begins in the traditional way: A supervisor with SAP access creates picking lists, prints them out, staples them to clipboards, and distributes them to the employees.

Things quickly get unnecessarily complicated at the elevator:

  • Instead of clear instructions, employees often see only storage location coordinates.

  • The first digit of the coordinate, for example, indicates the elevator, and then the correct shelf must be determined.

  • This means: interpreting, rethinking, memorizing—and, when in doubt, going back and forth multiple times to correct mistakes.

Typical consequences in practice:

  • You slip on the sheet, misread a coordinate, or make a mistake—and the wrong tray comes out.

  • Positions are checked off manually; the process is controlled individually, without technical support.

  • Every manual error costs time—often 20–30 seconds per correction, which adds up to a massive loss of time and productivity over the course of the day.

And what about inventory levels? As long as items aren’t posted in real time, inventory is “officially” still in the storage location—even though some items have already been removed throughout the day. Inventory write-offs are then processed in bulk in the evening. This can lead to temporary discrepancies in material levels in the system or delays in replenishment orders and deliveries.

How's it going with status C connect:IT? System-guided elevator integration in action.

status C connect:IT is not “just” a lift integration. It aims for more: status C connect:IT is an integration platform for warehouse systems—ensuring that processes at lift access points, goods receipt and shipment stations, and much more run exactly as employees need them to: guided, paperless, fast, and secure.

The SAP add-on from status C combines several operational and system-level functions:

  • Digital Order Management Instead of Paper-Based Lists

  • Dialog-guided order picking with clear user guidance

  • Optimized approach and retrieval logic within the lift group

  • Flexible workstation configuration (main/secondary logic, sequential or parallel)

  • Hardware-independent confirmation mechanisms (touch, button, scan, external signals)

  • Real-time postings with immediate inventory updates

  • Material-based storage strategy for load balancing and increased reliability

  • Prioritization logic for time-sensitive or customer-critical orders

  • Seamless integration with related processes such as transportation, replenishment, and scan dialogs

Paperless operations and real-time inventory data are therefore not isolated features, but integral components of a seamless, system-driven process design.

status C connect:IT not only controls elevators, but also improves the overall process logic.

1) Smart Start Sequence

The key to efficiency in day-to-day work is often not “faster pace,” but rather fewer downtimes. That’s why status C connect:IT ensures that:

  • all items to be picked that can be retrieved from a single shelf are processed in a single pass,

  • employees are not left waiting,

  • lifts are controlled in a way that minimizes idle time at the workstation.

Prioritization? It’s possible—when the process requires it.

By default, orders and items are grouped so that work at the lift flows smoothly. If the customer specifies priorities (e.g., cutoff times), the system can adjust the order accordingly.

2) Hardware-independent acknowledgment

For the logic in status C connect:IT, what matters is which action is to be triggered—not which input device triggers it. This means that acknowledgment can be performed using the following hardware, among others:

  • Click/touch on the interface (touchscreen-enabled)

  • Foot switch/foot pedal (ideal when your hands are full)

  • External hardware signals (e.g., manufacturer buttons)

  • Scans (material scan, batch scan, serial number entry)

3) Storage

An often-overlooked point: It’s not just outbound shipping—inbound receiving also determines performance.

status C connect:IT supports material-based load balancing across the lift group: Identical materials are distributed so that not everything is placed in the same lift. This increases reliability (maintenance or downtime of a lift can be better accommodated) and can reduce wait times in day-to-day operations. The underlying storage strategy can determine how many units of a material are already in the lift group and which lift is currently the best choice for unit XY.

4) Visualization & User Guidance

Visual cues are crucial for fast, error-free work. Depending on the hardware and workstation, the following can be integrated:

  • Shelf visualization in the interface

  • Light bars, laser pointers, acknowledgment aids

  • Additional visual guidance (if monitors cannot be optimally positioned)

Important: Hardware partners are interchangeable. The process in status C connect:IT remains stable—because acknowledgment is implemented as a uniform action.

Workstation Control at the Elevator: This Is How Flexible a Setup Can Be.

Every warehouse operates differently—sometimes several times a day. For example, the allocation of personnel and capacity across the warehouse systems in the morning differs from that in the afternoon of the same day. And that’s exactly why the workstation control in status C connect:IT is designed to adapt to processes and staffing plans.

Depending on volume and staffing, a lift group can be operated in different ways:

Option A – Sequential (1 person, multiple lifts):

  • One person operates a group of lifts and is guided through the picking process.

  • Goal: Avoid wait times and make efficient use of movement paths.

Option B – Parallel (multiple people, multiple lifts):

  • One person per lift, not per lift group. Each lift operates independently at the user interface.

  • Ideal for peak times with high throughput.

Practical Example: Shift Model:

  • Morning: high shipping volume → four employees, four lifts operating simultaneously.

  • Afternoon: more incoming shipments/quieter → one person manages the entire lift group.

The key point: In status C connect:IT, this lift setup is primarily a configuration matter—it can be flexibly changed, even on short notice. This way, each lift has the option to act as the “Main” lift and thus operate completely independently. If all lifts are synchronized, only one lift in the group acts as the “Main” lift and handles order management for the “Secondary” lifts.

Synergy Effects Thanks to the Connected Warehouse: status C connect:IT Is Just the Beginning.

status C connect:IT is deliberately designed to integrate seamlessly into adjacent processes—and can be combined with other solutions.

Important to know: The physical handling procedures for working with the lift and the other add-ons of the Connected Warehouse are identical—regardless of whether the process originates from SAP WM/STRM or SAP EWM. The key factor is that the integrated add-ons are based on a uniform logic for travel orders, approach logic, and dialog guidance.

Also from status C: Multi Order Picking (MOP) is becoming Advanced Order Processing (AOP).

Order initiation and order confirmation can also be enhanced with Advanced Order Processing (AOP). AOP builds on established multi-order picking approaches—with a focus on defining destinations/boxes early on and further enhancing order confirmation through visual guidance and process reliability.

Curious?

If you'd like to discuss your system landscape (SAP ERP/S/4HANA, WM/EWM, device manufacturers, network conditions), we'd be happy to show you what status C connect:IT could look like in your scenario.

Let's talk!

Read more articles on SAP here:

SAP LGM Roadmap 2026/2027: Zeitleiste der geplanten Funktionen von Q4 2026 bis 2027
October 27, 2026

SAP LGM roadmap 2026/2027: What SAP Logistics Management can do today and what comes next.

Over five posts, we have looked at SAP LGM from a practical angle, from goods receipt and putaway through mobile processes to integration effort and costs. To close the series, we look ahead: What can SAP Logistics Management (SAP LGM) do today, what is on the SAP LGM roadmap for Q4 2026 and 2027, and where do we still see gaps? SAP LGM has now been on the market for almost a year. We put the roadmap into context and give a clear recommendation on how you, as someone responsible for the warehouse and supply chain, should approach it.

Mitarbeiter kommissioniert am Lagerlift mit status C connect:IT Bedienoberfläche
September 10, 2026

Confirmation at the storage lift & control of workstations using status C connect:IT

A clipboard, a printed picking list, storage location coordinates from which you first have to determine the correct shelf: More time is wasted at the storage lift than any statistics show. And as long as updates aren’t posted in real time, inventory is “officially” still in its location, even though it was removed long ago.

Using real-world scenarios, we’ll show how confirmation at the lift runs directly from SAP: paperless, dialog-driven, hardware-independent, and with real-time updates.

August 21, 2026

SAP LGM – Integration Effort and Costs: SAP BTP, Integration Suite and Cloud Connector at a Glance

SAP LGM must prove itself where budgets are actually decided: in cost estimation. In Part 4 of our practical series, we show just how high the integration costs via SAP BTP, Integration Suite, and Cloud Connector really are—and where costs are most often underestimated: from the Integration Suite to scaling across multiple locations.

This way, status C provides a solid guide for your cost planning—based on real integration scenarios, not on wishful thinking.